mirror of
https://github.com/tiennm99/iammiti99.git
synced 2026-10-11 03:13:37 +00:00
1.7 KiB
1.7 KiB
title, description, status, priority, created
| title | description | status | priority | created |
|---|---|---|---|---|
| v0.4 release: ship gallery-CSS extraction + more icons + opt-in RSS | Ship issues #11, #10, #8 each as its own PR; tag v0.4.0. Issues #7 (OG auto-gen) and #9 (multi-section bio) deferred to v0.5 per their own deferral notes. | completed | P2 | 2026-05-10T00:00:00.000Z |
v0.4 release: ship the three well-scoped v0-line enhancements
Overview
Per scope-check: ship the three well-scoped issues now, defer the two design-heavy ones.
- Phase 2 Extract gallery CSS (#11) — pure refactor, smallest scope
- Phase 3 Add more icons (#10) — mechanical, data-driven
- Phase 4 Optional RSS feed (#8) — additive opt-in
- Phase 7 v0.4.0 release prep
Each phase ships as its own feature branch + PR (matches repo pattern).
Deferred to v0.5
- #7 Auto-generate OG image — issue text: "If no path meets [≤30 KB binary], defer to v0.5". Of 5 candidate approaches, only
pyftsubset Inter+ base PNG might fit; needs measured prototype before committing. - #9 Multi-section bio — issue text: "Likely a 2026-Q3 candidate, not v0.4". Schema design dispute; needs
/ck:brainstormbefore a plan.
Phases (active)
| Phase | Name | Status |
|---|---|---|
| 2 | Extract gallery CSS (#11) | Completed |
| 3 | Add more icons (#10) | Completed |
| 4 | Optional RSS feed (#8) | Completed |
| 7 | v0.4.0 release prep | Completed |
(Phase numbers preserved from original 7-phase scaffold for stable references.)
Dependencies
- Phase 7 depends on Phases 2, 3, 4. Each of 2/3/4 is independent and ships as a separate PR.