phase, title, status, effort, priority, dependencies
phase title status effort priority dependencies
1 Lunar core helpers completed S P2

Phase 1: Lunar core helpers

Overview

Add the two pure helpers the handlers need: the disputed-boundary set + membership check, and leap-month existence probing. No behavior change to existing conversion functions.

Requirements

  • Functional: nearDisputedBoundary(jdn int) bool reports whether the lunar month containing solar day jdn starts or ends on one of the 7 disputed month boundaries.
  • Leap-variant existence needs NO new helper: handlers probe lunarToSolar(day, month, year, true) and treat err == nil as "leap variant exists" (DRY — reuses existing validation; also naturally suppresses the hint when e.g. day 30 doesn't exist in the 29-day leap month).
  • Non-functional: helpers stay in lunar.go, unexported, zero allocations on the hot path (package-level set built once).

Architecture

  • disputedMonthStarts — package-level map[int]bool built in a var initializer from jdFromDate on the 7 dates recorded in docs/amlich-known-issues.md: 09/12/2072, 15/11/2077, 07/05/2130, 26/05/2150, 17/05/2159, 22/01/2175, 26/01/2199.
  • nearDisputedBoundary(jdn int) bool — mirror solarToLunar's month-start search:
k := floorInt((float64(jdn) - jdNewMoonEpoch) / newMoonCycle)
monthStart := getNewMoonDay(k + 1)
for monthStart > jdn {
    k--
    monthStart = getNewMoonDay(k + 1)
}
return disputedMonthStarts[monthStart] || disputedMonthStarts[getNewMoonDay(k+2)]

Rationale for checking next start too: if the end boundary of the containing month is disputed, the month's length (and day numbers near its end) is what may shift.

  • Modify: internal/modules/amlich/lunar.go
  • Modify: internal/modules/amlich/lunar_test.go

Implementation Steps

  1. Add disputedMonthStarts set with a comment explaining provenance (new moon within ±2 min of UTC+7 midnight; see docs/amlich-known-issues.md) — no plan/audit labels in comments.
  2. Add nearDisputedBoundary.
  3. Test: each of the 7 JDs is an actual month start per the engine — for each date, assert solarToLunar(d,m,y) returns lunar day 1. If any assertion fails ±1 day, the doc date and the engine's boundary disagree: adjust the set entry to the engine's month start and flag the doc discrepancy in the phase report.
  4. Test nearDisputedBoundary: true for a mid-month day of the month starting 09/12/2072, true for a day in the month before it (whose end boundary is disputed), false for an ordinary 2072 date far from the boundary and for a 2024 date.

Success Criteria

  • 7 set entries verified as engine month starts by test
  • nearDisputedBoundary true/false cases covered as above
  • Existing lunar tests untouched and green

Risk Assessment

  • Doc dates might be the full-Meeus engine's boundaries rather than the current engine's (off by one day). Mitigation: step 3's pin test resolves it mechanically; the ±1-day neighborhood is the same disputed lunation either way.